| Date: |
12-26-2018 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
turtledeck prep |
|
|
Made the boards for the floor so that I can lie down inside the rear fuselage to rivet the skins on. Clecoed the turtledeck on. Finished off waterproofing and insulating the garage extension so that I can get the wings on. |
||