| Date: |
10-31-2018 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
drilled and fitted H and VS, fitted elevators |
|
|
Final adjustment to the position of the HS and VS, all aligned within 1mm of 'true' Bolt holes drilled and new bolts attached. elevators fitted temporarily, elevator horns match drilled. |
||