Date:    2-29-2020
Number of Hours:    7.00
Brief Description:    Getting ready for last inspection..
3 hours pf paperwork in preparation for the penultimate inspector visit.
Checked the aircraft from front to back.... butRod still found 3 nuts that needed tightening!
Sorted out the trim controls as P1 and P2 moved in opposite directions!
Fitted the port wing root fairings... bugger of a job with the Aerolab gascolators to work around.