| Date: |
2-29-2020 |
|
| Number of Hours: |
7.00 |
|
| Brief Description: |
Getting ready for last inspection.. |
|
|
3 hours pf paperwork in preparation for the penultimate inspector visit. Checked the aircraft from front to back.... butRod still found 3 nuts that needed tightening! Sorted out the trim controls as P1 and P2 moved in opposite directions! Fitted the port wing root fairings... bugger of a job with the Aerolab gascolators to work around. |
||