Date:    8-11-2018
Number of Hours:    3.00
Brief Description:    flop tubes installed
Safety wired flop tubes prepped and anti-rotation plate fitted. Trial assembly was good.
Proseal time again!

All went smoothly, and I think that the bulkhead fittings are well sealed. Rivetted the antirottion plate to the first rib and all sealed up. I'll tidy it up the 'overspill' with some MEK later.