| Date: |
8-21-2009 |
|
| Number of Hours: |
60.00 |
|
| Brief Description: |
Building the WRONG Spinner |
|
|
Worked two three day weekends to build a top quality spinner that was the wrong size. this was a 12" NOT the 13" that I needed. Oh well, the second went a lot faster. |
||