| Date: |
4-30-2005 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Center Fuselage |
|
|
Back to the floor ribs. Fabricated the spacers for the back of the center floor ribs. Clecoed the baggage area ribs. Clecoed the floor skin to the floor spars and baggage area ribs. |
||