| Date: |
6-14-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Fixed leak and did final pre start checks |
|
|
Worked on fuel leak. May have fixed it, but will talk to Rotorway. Also trimmed vertical stabilizer rear spacer. Have approximately 15 1/4" to the left of the main rotor. Did all of the prestart electrical checks. |
||