| Date: |
1-30-2006 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Top and bottom heat shields |
|
|
Final installed lower heat shield. Fabricated patches where there was too much clearance. Also fabricated brackets for upper heat shields and installed the heat shields. |
||