| Date: |
10-19-2005 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Installed tail boom items |
|
|
Installed the doublers for the horizontal stabilizer. Installed the nut plates and the stabilizer. Installed the slider assembly and the forward mount for the vertical stabilizer. Only need to debur and rivet in the slider assembly. |
||