Date:    6-6-2006
Number of Hours:    3.00
Brief Description:    Airframe Wiring
Worked on airframe wiring. Removed fuel tanks to make seat belt installation easier. Seat tub is now permanently installed. Working on wiring: added FADEC harness and connected to ECU's. Installed fuel transducer connector and oil and water temperature connector.