Date:    1-26-2008
Number of Hours:    1.50
Brief Description:    Pedals and heat shields
Continued on pedals. Got one more to fit. Finished reinstalling the heat shields after locating the oil leak. Cotter keyed the muffler attach bolts. Finished fabricating the tail rotor pitch adjustment tool.