| Date: |
8-6-2005 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Cyclic Controls |
|
|
Cut cyclic control yoke bushings to length. Drilled and reamed holes in bushings to size D. Installed yokes on control arms and drilled wire holes in control arms. Installed yokes on cross tube. |
||