| Date: |
11-9-2007 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Installed tail boom items |
|
|
Installed the vertical stabilizer on the tail boom. Installed the strobe. Lubricated the tail rotor idler pulley scissor arms. Temporarily installed the horizontal stabilizer. |
||