Date:    11-9-2007
Number of Hours:    3.00
Brief Description:    Installed tail boom items
Installed the vertical stabilizer on the tail boom. Installed the strobe. Lubricated the tail rotor idler pulley scissor arms. Temporarily installed the horizontal stabilizer.