Date:    9-21-2006
Number of Hours:    4.00
Brief Description:    Installed tail rotor drive train
Installed tail boom. Installed tail rotor drive train and control cable. Had to trim additional skin on tail boom to allow for belt installation. Worked on the installation of tail position light cable and strobe cable.