| Date: |
8-11-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Main Rotor Final Adjustments |
|
|
Reinstalled the front tub section. Installed a rubber up stop for the collective and a rubber bottom bumper. It now has a minus 1.5 to plus 9.5 degrees of range. Torqued all bolts on the rotor head. Adjusted preload on c;yclic to 3 lbs at center of range. |
||