| Date: |
7-18-2008 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Balanced Blades |
|
|
Finished balancing the main rotor blades. Got the weights to less than 1 gram difference. Final installed the tip weights and glued in the end plugs. Now need to reinstall the 3/8 inch bolts in the tetter bracket and measure and drill the pitch horns. |
||