Date:    7-18-2008
Number of Hours:    2.00
Brief Description:    Balanced Blades
Finished balancing the main rotor blades. Got the weights to less than 1 gram difference. Final installed the tip weights and glued in the end plugs. Now need to reinstall the 3/8 inch bolts in the tetter bracket and measure and drill the pitch horns.