| Date: |
9-29-2014 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Cabin attachment |
|
|
Alligned the lower cabin frame to the door frame and transferred the drill sites to the cabin. Drilled #30 holes then followed with #19 holes. Needed to assure the #2 gauge welding cable for battery power was clear of the drilling. Also images show distance of cabin from outside door frame. |
||