| Date: |
6-27-2014 |
|
| Number of Hours: |
10.00 |
|
| Brief Description: |
Join fuselage to empennage |
|
|
I joined then clecoed the empennage to the fuselage. After match drilling the holes I took the two sections apart. I then cleaned up the holes and dimpled the appropriate holes in the skins. I then placed proseal along the side and lower skins. The fuselage and empennage were joined again and all the rivets to hold the structures were placed. A few of the shop heads bent over and I drilled them out and replaced them. |
||