| Date: |
5-25-2014 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Step installation |
|
|
Cleaned up entry hole for step into baggage area. Prepared support block, drilled and bolted it to the mid baggage rib. Cleaned and primed the step before installing with a bolt. Needed to place step 45 1/4 inch aft of aft bulkhead. Began fabricating parts and supports for the upper fwd fuselage assembly, the support forf the avionics panel. |
||