| Date: |
1-3-2014 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
seat subassembly |
|
|
Clecoed the outbd baggage rib, inbr and mid baggage ribs to the Fuselage buklhead assembly. Match drilled #30 holes, disassembled then deburred. Primed the mating surfaces reclecoed then began riveting. |
||