| Date: |
10-18-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Tailcone |
|
|
Priming the mating surfaces to prevent corrosion. Riveted together the most aft bulkhead and the bellcrank. Preparing the more forward bulkheads with priming. Riveting next. |
||