| Date: |
6-16-2013 |
|
| Number of Hours: |
7.50 |
|
| Brief Description: |
Horizontal Stabelizer |
|
|
Worked on deburring the inspar ribs and nose ribs. Began building the jig to support construction of the horizontal stabelizer. Used 1 x 8 pine 8' lengths and fitted end to end to get a final length of 134 inches. Then stabelized laterally with 1 x 6 pine. Mounting four points to support the stabelizer. |
||