| Date: |
6-7-2013 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Horizontal Stabelizer |
|
|
Spent time reforming a poorly drilled spar cap for the front spar of the horizontal stabelizer. Redrilled the matching holes in the spar flanges and cap. |
||