| Date: |
5-27-2013 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Horizontal Stabelizer |
|
|
Prepared the front spar of the horizontal stabelizer. Spar caps and spar stiffener match drilled along with spar attach brackets. Machine countersink front holes on stiffener and 9 holes in center on both spar flanges. Cleaned and primed mating surfaces. |
||