| Date: |
5-17-2013 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Vertical Stabelizer |
|
|
Drilled out about 7 rivets in the vertical stabelizer spar because of stress lines I placed on the machine head. The bottom of the spar had a hole that I messed up a few days ago. I could not rivet the hole so I drilled two adjacent 3/32 holes, machine counter sunk those rivets. Placed the skin over the vertical stabelizer and began riveting. Riveted the front inspar ribs and began riveting the spar. |
||