| Date: |
4-25-2013 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Vertical stabelizer |
|
|
Finished metal preparation on the vertical stabelizer. Matched drilled and deburred all holes. Need to prime bare surfaces so waiting for the full face mask before I paint. |
||