Date:    4-25-2013
Number of Hours:    2.50
Brief Description:    Vertical stabelizer
Finished metal preparation on the vertical stabelizer. Matched drilled and deburred all holes. Need to prime bare surfaces so waiting for the full face mask before I paint.