| Date: |
10-9-2015 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Routing wires |
|
|
More wire routing. Decided to run the Tosten Grips wires within the control stick. I never liked how they were outside the stick and wrapped to the outside. Drilled a hole in the end of the stick where the handel attaches. No load distributing forces were interfered with. Also routing wires further under the panel |
||