Date:    3-24-2013
Number of Hours:    3.50
Brief Description:    Nearing the end of the tanks
Today was fun tiding up & final installing, sealing & torqueing all of the AN fittings.

- Torqued & safety tied the flop tube assembly.
- Installed the completed flop tube assembly in the right tank cleaned, sealed, torqued.
- Installed the vent line bulk head fitting in the right tank. cleaned, sealed, torqued etc.
- Final torqued vent line fittings in both tanks.
- Fitted, assembled cleaned, sealed, torqued etc the left fuel tank (standard fuel pick up). This fuel pick up / access panel assembly is a bit of a PITA to get in place with the domed / sealed plate nuts but is definately doable."