| Date: |
2-26-2008 |
|
| Number of Hours: |
10.00 |
|
| Brief Description: |
Lots more schematics |
|
|
Worked on schematics more. Trying to get my head around the wiring needs for the aircraft from the spar box aft. For the most part, I studied the generic wiring schematics supplied by Vans and considered my needs and where I would route the wires through the airframe. |
||