| Date: |
2-3-2008 |
|
| Number of Hours: |
0.75 |
|
| Brief Description: |
Installed Copper Bar Between Master and Starter So |
|
|
Fabricated the copper bus bar that runs between the Master Relay and the Starter Solenoid. Not much to it, but wanted to take some pics and make a log entry. |
||