Date:    2-3-2008
Number of Hours:    0.75
Brief Description:    Installed Copper Bar Between Master and Starter So
Fabricated the copper bus bar that runs between the Master Relay and the Starter Solenoid. Not much to it, but wanted to take some pics and make a log entry.