| Date: |
7-3-2009 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Avionics Ground Point Installed |
|
|
After a long work break, I was able to get back at it and have installed the ground point under the instrument sub-panel. The second pic shows it viewed from the bottom. |
||