| Date: |
1-14-2007 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Flight Control Installation |
|
|
Began the process of installing the pilot and copilot sticks today. Everything went pretty well except that some of the nuts/bolts are a pain to get to. I installed the control horn for the sticks and the interconnecting rod between the sticks. I also fabricated and installed the forward elevator push/pull tube. It connects the control horn to the elevator bellcrank just aft of the baggage compartment. The sticks haven't been cut down yet and are ridiculously long. And, I need to align the sticks so that they are parallel. |
||