Date:    10-11-2015
Number of Hours:    4.00
Brief Description:    Cockpit Floor Reinstallation
Reinstalled the cockpit floor after removing it for the removal of the entry steps (not needed on a taildragger). Also reinstalled the flap interconnect rod and drive motor.