| Date: |
7-9-2006 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Rudder/Elevator Attach Points |
|
|
Fine-tuned adjustments for the rod-end bearings on both elevators and the rudder. Checked travel of flight control surfaces to be within ranges set by plans. Left elevator control horn was fabricated by Van's with a slightly different cant than the right one resulting in the need to adjust the elevator aft by 1/16 inch to get nose-down deflection of 22.8 degrees (same as the right elevator, range 20-25 deg). |
||