Date:    7-5-2006
Number of Hours:    2.50
Brief Description:    Right Elevator Leading Edge
Bent the leading edge of the right elevator using a 3/4 in. galvanized water pipe wrapped in duct tape.

Next time do the segments separately--much easier that way.

Installed rod-end bearings to elevator spar.