| Date: |
7-5-2006 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Right Elevator Leading Edge |
|
|
Bent the leading edge of the right elevator using a 3/4 in. galvanized water pipe wrapped in duct tape. Next time do the segments separately--much easier that way. Installed rod-end bearings to elevator spar. |
||