| Date: |
6-1-2006 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Rudder Trailing Edge Prep |
|
|
Fabricated trailing edge jig using angle aluminum (match drilled from the AEX). Pro-sealed the AEX between the trailing edge skins and clecoed to the jig. |
||