| Date: |
3-24-2006 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
VS Dimpling |
|
|
Finished deburring VS parts after match drilling. Setup DRDT-2 dimple die press and dimpled the ribs, spars and skin. What a great tool---I'm so glad I got it. Quiet and simple one-handed operation. After some clarification of the plans, clecoed everything back together to locate and drill the bottom corner holes of the bottom VS-411PP hinge bracket. Instructions called for them to be drilled in assembly with the fuselage, but that only applies to the taildragger. |
||