| Date: |
3-21-2006 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Started on VS |
|
|
Finished prepping the HS-405 ribs. Since I'm waiting on my new HS-702s to arrive, I decided to start on the Vertical Stabilizer. This is very easy so far compared to the HS. I prepped the ribs after I clecoed the Spar Doubler to the rear spar. Match drilled the hinges and doubler, ribs, and spars. Then I clecoed the VS skin to the frame. Tomorrow I'll match drill the skins. |
||