| Date: |
5-26-2007 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
RH wing tip |
|
|
5/23 - 5/26 The rh wing tip was completed. The angles formed. The fiberglass tip installed, and the end sheet fit and installed. The nav light was also installed in the fiberglass tip. |
||