| Date: |
7-7-2011 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Upgraded right wing spar. |
|
|
Removed all rivets and replaced 1680mm of 6W3-6 with 6ZU-1-1 angle which is 1/8 thick. Much stronger. Bolted together with AN3 bolts. Also fitted 6ZU-1-2 wing root doubler then removed so as to fit rear ribs first. |
||