| Date: |
7-7-2016 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Wiring, Brakes, MLG |
|
|
More cleaning-up of the wiring,, Terminating ends, assembling connectors, and supporting the wire-runs Hoisted the airframe off the ground so I could run the actuators through, once again, to verify that the up & down MLG icro-switches were correctly placed. Good thing I checked, had to reposition two of them! Bled the brakes (Probably will require another bleeding),, mainly did this to check for leaks. |
||