Date:    7-7-2016
Number of Hours:    5.00
Brief Description:    Wiring, Brakes, MLG
More cleaning-up of the wiring,,
Terminating ends, assembling connectors, and supporting the wire-runs

Hoisted the airframe off the ground so I could run the actuators through, once again, to verify that the up & down MLG icro-switches were correctly placed. Good thing I checked, had to reposition two of them!

Bled the brakes (Probably will require another bleeding),, mainly did this to check for leaks.