Date:    12-31-2015
Number of Hours:    1.50
Brief Description:    Aileron Torque Tube
Assebled and connected the lower, airleron torque tube bellcrank.
I also fabricated the two upper aileron tie-rods, for a later install, since I had the drill press set up to drill the through-holes,,