Date:    7-13-2008
Number of Hours:    5.00
Brief Description:    Started Trim Tab
Began the trim tab construction. Clecoed and match drilled the assembly. Fabricated the foam ribs and made a fixture to bend the ends of the tab. Bends came out ok, not terrific, but ok.