| Date: |
6-12-2008 |
|
| Number of Hours: |
6.20 |
|
| Brief Description: |
Began Right Elevator Construction |
|
|
I began construction of the elevators. My grandson was over and was dying to help me work on the plane, so I put him to work clecoing the spar and ribs together for match drilling. I decided to do both elevator's at the same time. I am preparing the parts for each one and then will be assembling both of them back to back. |
||