| Date: |
11-26-2009 |
|
| Number of Hours: |
4.50 |
|
| Brief Description: |
Prepared right hand side of HS & assembled full st |
|
|
After three days knocked out by 'flu, and feeling like the proverbial dishrag, I finally made it out into the garage just as it got dark this eveing. Four and a half hours later, I'd prepared the right hand side of the horizontal stabilizer, making full use of all the lessons learned from the left hand side. This is not a small piece of structure, so it feels a real achievement. The forward spar edge distances on this side are WELL within tolerance, thanks for asking. |
||