Date:    4-24-2011
Number of Hours:    4.00
Brief Description:    Miscellaneous
NACA vents were permanently installed. Emp tips were fiberglassed further. The AeroLed tail light mount was installed into the tip fairing. And, the parking brake valve was installed.