| Date: |
12-27-2010 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Drilling |
|
|
Final drilled the Stop/doubler. Drilled attachment bar support angle. Drilled elevator stop. Removed side skins and drilled seat belt anchors. Drilled static ports and cover paltes. |
||