Date:    12-21-2010
Number of Hours:    2.00
Brief Description:    Final drilling
Final drilled the platenut attachments and other holes into the bellcrank angles. Bellcrank angle and bellcrank rib assembly was done and drilled. Longerons were fitted to the skins and frames.