| Date: |
8-4-2011 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Cut sheet for elevators |
|
|
Cut stock control surface sheets for both elevators. Used the band saw. To eliminate any damage to the metal, cut wood forms to provide a rigid cut. (Being a wood worker helps!) The wood blocks worked great. |
||