Date:    8-4-2011
Number of Hours:    2.50
Brief Description:    Cut sheet for elevators
Cut stock control surface sheets for both elevators. Used the band saw. To eliminate any damage to the metal, cut wood forms to provide a rigid cut. (Being a wood worker helps!) The wood blocks worked great.