Date:    9-28-2013
Number of Hours:    3.25
Brief Description:    Installed top skin
Installed top skin with Maria's help. Always goes faster to have two people install rivets!!! Also cut rounded notch in main spar stiffener to allow electrical wire conduit to have a straight run and not have a wear point. This was at Ken Hetge's recommendation when he inspected the wing.

Ground down and polished all installed flush rivets.